Control panel documentation

Gravity UV Aeration Control Panel

CP-001-2-0003

Continuous aeration · UV lamp supervision · high-water annunciation · factory-integrated CAM-4G cellular alarm. 120 VAC single phase, two separate feeds. For Hydro-Action® gravity-flow aerobic treatment systems. UL 508A Listed, file E547664.

Read first — terminal 2 stays live with the main breaker OFF

This panel is fed by TWO separate 120 V circuits: main power on terminal 1 and a dedicated control / alarm feed on terminal 2. The control feed keeps the alarm circuit and the CAM-4G module energized when main power is lost, so terminal 2 remains energized with the main feed off. Disconnect BOTH circuits and verify with a voltage tester before opening the panel. Neutrals from both feeds must land on the same neutral bus in the feeder panel. The CAM-4G module contains four non-rechargeable AA batteries — remove them before any internal service on the module, and never attempt to recharge them.

Documents

Quick Start Guide Pre-energize checklist, terminal landings, start-up and functional test, CAM-4G quick setup · PDF Operation Manual Safety, specifications, installation, wiring and line drawing, operation, CAM-4G SMS programming, maintenance, warranty · PDF Specification Sheet Ratings, rostered components, terminal torque values, compliance notes · PDF Troubleshooting Guide Fault isolation by device class — power, compressor, UV, alarm, CAM-4G, terminals · PDF

At a glance

Model
CP-001-2-0003 — Gravity UV Aeration Control Panel
Supply
120 VAC, 60 Hz, single phase — two separate feeds: main power (terminal 1) and control / alarm (terminal 2)
Total FLA / SCCR
10 A · SCCR 5 kA
Supply circuits
Main power on a 15 A breaker · control / alarm circuit 5 A max · field-supplied main disconnect required
Compressor
120 V, ¼ HP max (5.0 FLA) — runs continuously whenever main power is present
Overloads
None in this panel — the motor must incorporate integral overload protection
Branch protection
Internal branch-circuit protection is sized to the connected load and control system requirements. The installer selects the upstream feeder and main disconnect and sizes all supply conductors per the NEC, including Articles 240, 310 and 430.
UV
Electronic or magnetic ballast · 25–35 W customer-supplied lamp · supervised by a PRI-51/1 current monitoring relay, trip level and 0.5–10 s response delay factory set
Protection
An air pressure switch verifies compressor output; loss of air pressure raises a compressor fault. A UV fault, compressor fault or high water raises the beacon, horn and an SMS. High water is annunciation only — it never interrupts the compressor or UV.
Alarm
Red beacon · 95 dB horn · silence push-button · R1 dry-contact relay (NO/NC/COM) · fed from the control circuit
Cellular alarm
Factory-integrated CAM-4G · 4G LTE CAT-1 with 3G/2G fallback · SMS to up to three numbers · four dry-contact or conductivity inputs · four AA non-rechargeable backup batteries, replace annually · configured entirely by SMS text command
Enclosure
Type 4X (NEMA 4X) polycarbonate · −30 °F to 140 °F
Field wiring
Copper, 600 V, 60 °C minimum · DK4N / DK4N-PE 22–10 AWG · DK2.5N / DK2.5N-PE 22–12 AWG
Terminal torque
Dinkle rated values — DK4N / DK4N-PE (GG12) M3 at 0.6 N·m (5.3 in-lbs) · DK2.5N / DK2.5N-PE M2.5 at 0.4 N·m (3.5 in-lbs). Never apply a single blanket torque across both types.
Compliance
UL 508A Listed · file E547664 · NFPA 70 (NEC) · CAM-4G: FCC Parts 15, 22, 24 · RoHS · IC RSS-132 & RSS-133

Support & warranty

This panel is manufactured for AKHA Manufacturing, LLC. All technical support, warranty claims, service questions, alarm response and callbacks are administered by them. Legacy Controls does not accept direct enquiries from end users or installers for this product line.

Toll free 800-370-3749 · Phone (574) 936-2542

2055 Pidco Dr. / P.O. Box 640, Plymouth, Indiana 46563